Shake well. SURFACE MUST BE CLEAN & MOISTURE FREE. Areas not requiring coating should be masked. Coating: Spray top to bottom, allowing coating to flow around components. Rotate board 90˚ and repeat process 2 or more times. If nozzle clogs, clean with solvent or use new nozzle. Cure: A 1.0 mil coating will be tack-free in 60 minutes. Full cure requires 72 hours @74˚F/23˚C. Heat Cure: 30 minutes @90˚F/32˚C, then 45 minutes @199˚F/93˚C. An open vessel of water placed in the drying chamber will facilitate curing. UV detectable for QC inspection. Removal: Coating may be removed by soaking in Conformal Coating Remover. Use TraceTech™ Conformal Coating Remover Pen for spot removal. After the new component is installed, areas should be cleaned and re-coated.